Results Page
Links

  Home Page
Technology Page
What Is Being Said
Results Page
F.A.Q. Page
For My School Page
In The Media
Licensing Page

Advantage Classroom
Slide Show

 

 
Other Links


Link To CNBC
 
Link To Techno 2100
 
Link To EPA
 
Link To The H.L. Turner Group
 

A Leading Edge Learning Environment


The Results


 
The Advantage ClassroomTM concept has been built into 12 schools from 1996-2000. The total cost of costruction was ±;$40,000,000.
 
Currently under construction:
There are 8 more schools valued at ±$60,000,000.
 
In planning and design:
There are presently an additional 12 schools valued at ±$90,000,000.

 
Place Holder
 
For More Info Contact:
The H.L. Turner Group Inc.
27 Locke Rd., Concord, NH 03301
Phone: (603)228-1122 - Fax:(603)228-1126
E-Mail: info@hlturner.com
Copyright © 2000 The H.L. Turner Group Inc.
ALL RIGHTS RESERVED